top of page

The Blower Door Test

  • May 12, 2017
  • 1 min read

Updated: Feb 27

Blower Door Testing is essential to verify air tightness in construction. The building is sealed before air is pumped in to the structure to detect leaks. Advanced planning is required for a passive house. Passive house requires a sealed building envelope and a considerable amount of insulation (compared to conventional houses).

 
 
bottom of page